Jungheinrich Junior AME13 Directives for Executing Screwed Joints

Related Contents:

Jungheinrich JETI ForkLift Judit-4 v4.37 4.34 2023 Free Download

Jungheinrich JETI ET 4.37 4.34 EPC 2023 Free Download

2023 Jungheinrich Forklift JETI SH v4.36 v4.34 Service Free Download

 

 

Cut pipe at right angle and deburr

Jungheinrich Junior AME13 Directives for Executing Screwed Joints (1)

All threaded parts must be oiled (do not grease)

Push nut l and cutting ring 2 over the end of pipe 3

Jungheinrich Junior AME13 Directives for Executing Screwed Joints (2)

1.Screw nut by hand onto the male member.

2.Push pipe in till it comes to rest.

3.Tighten with wrench about 3/4 turn.

4.The cutting ring will cut itself with its edge into he pipe.

5.Unscrew nut fom male member.

Jungheinrich Junior AME13 Directives for Executing Screwed Joints (3)

1 Checking the cutting edge.

It is of no importance if the cutting ring can be turned on the end of the pipe.

2 The final fitting on the male member is performed with another 3/4 turn.

Jungheinrich Junior AME13 Directives for Executing Screwed Joints (4)

For more Jungheinrich trouble repair case,please refer to Jungheinrich Trouble Repair

Visited 1 times, 1 visit(s) today