BOMAG 177D-4 Plug-type Injection Pump Assemble Guide

This instruction show you guide on how to assemble plug-type injection pumps for BOMAG 177D-4.

 

Related Contents:

Bomag EPC 2021 2017 Electronic Parts Catalogue Free Download

 

Procedures:

Engines of type 2011 are fitted with individual injection pumps for each cylinder. When installing individual plug-type injection pumps the distance to the camshaft must be correctly adjusted shims,because this determines the start of commencement.

1.Unscrew the plug from the crankcase.

2.Operate the throttle lever to bring the governor rod to middle position and hold it in this position. Then turn the locating pin for the governor rod (BOMAG part-no. 079 947 03) into the crankcase.

Then the throttle lever can be released again.

3.Turn the engine by the crankshaft pulley, until the plunger stroke of the respective cylinder is at bottom dead centre position.

4.Assemble the injection pump roller plunger. For this purpose use a magnetic lift.

5.Measure measurement ’A’ from crankcase contact face to spring plate contact face of plunger.

6.The nominal measurement X of the injection pump is available from the BOMAG service department or the service department of Deutz against the specifications on the engine type plate. (There are several versions and adjustment measurements).

7.Determine the difference between installation measurement „X“ and the measured dimension ’A’.

Example: Installation measurement “X“ = 60 mm

– measured depth measurement A = 59,35 mm

Difference = 0,65 mm

8.Choose a compensation gasket from thge table according to the marking.

 

In the example above P/N 057 114 47 should be selected.

9.Install the selected gasket; observe the assembly position!

10.Pull the locking pin out of the injection pump and insert the locking wire (BOMAG part-no.079 947 06 / 079 947 07) into this bore. Insert the locking wire into the bore in the injection pump control lever provided for this purpose and engage it in the tapped leak oil bore

11.Assemble the injection pump. Press the injection pump centrically in against the stop.

Tighten the nuts.

Tightening torque: 21 Nm

12.Pull out the locking wire.

13.Close the bore again with the locking pin

14.Remove the locating pin from the governor rod

15.Insert the plug with a new copper ring and tighten it: Tightening torque 18 Nm

More repair case for BOMAG,please refer to:BOMAG Trouble Repair

auto

Recent Posts

Doosan Machine Fault Code P060B ADC Test Error Solution

This instruction show you guide on how to solve Doosan heavy duty machine engine fault…

7 hours ago

Allison 3000 & 4000 Gen5 Fault Code P070C Transmission Fluid Level Sensor Circuit Low

Here is the instruction show you guide on how to solve Allison 3000 & 4000…

1 day ago

Detroit GHG17 Heavy Duty Engine Power Verification With Chassis Dynamometer

Detroit GHG17 Heavy Duty Engine Power Verification With Chassis Dynamometer. The chassis dynamometer is a…

4 days ago

How to Perform Fuel System Test for Kohler Engine EFI System

Here is the instruction show you guide on how to perform fuel system test for…

5 days ago

Fiat and GM ECU 7.9.6 Components Diagram

Vehicles: Vectra 2.0 Flex and Astra Flex More ECU PINOUT Components: ECU Modules Repair Pinpout…

7 days ago

How to Repair Deutz EMR3 SPN 523562 Trouble Code

Error description INJECT. PERIOD ZYL.2 Begin of injection of cylinder 2: the ECU can not…

1 week ago