Doosan heavy duty machine VBO calibration require you to do pump EPPR valve check,so here show you the steps.
Preparations:
Doosan Data Monitoring System DMS-5 DMS-3 Free Download
Pump EPPR valve check
*Calibration judgement
3.1. Measure the input & output current of the pump EPPR valve in certain condition
Ex. DX350LC-7, Normal outputs of pump EPPR valve (Please refer the shop manual to check the exact value
on each model)
3.2. Check the physical condition of the EPPR valve
3.2.1. Assembly condition
3.2.2. External damage
3.2.3. Short circuit
Ex. DX350LC-7(Please refer the shop manual to check the exact value on each model)
3.3. Measure the resistance of the EPPR valve
3.3.1. Measure the resistance of the valve coil: If the measurement is infinite, this indicates an
open circuit of the coil in the valve.
3.3.2. Measure the resistance of the valve coil: If the measurement is 0Ω, this indicates a short
circuit of the coil in the valve.
More topics for Doosan,please refer to:Doosan Trouble Repair
This instruction show you guide on how to perform hydrocarbon dosing control valve test for…
This instruction show you guide on how to solve Fendt tractor SPN 100 FMI 31…
Detroit GHG17 Heavy Duty Engine Piston Protrusion Measurement Procedure Related Contents: 2024.06 Detroit Diesel…
This instruction show you guide on how to remove and install water temperature regulator housing.…
Monza, Kadett and Ipanema Multec 700 GM ECU Components Pinout Vehicles: Monza, Kadett and…
This illustration show you guide on how to remove oil pressure regulation valve for CLAAS…