This instruction show you guide on how to install injector for ISUZU F series 4HK1 Euro 4 Engine 1C fuel system.
Preparations:
2023 2019 Isuzu G-IDSS Export Diagnostic Software Free Download
Procedures:
Component Views
Part name
1Bolt
2Injector terminal
3Nut
4Harness bracket
5Sound insulation cover
6Bolt
7Cylinder head cover
8Bolt
9Bolt
10EGR cooler duct
11 Bolt
12 Bolt
13 Gasket
14 EGR valve
15 Bolt
16 Injection pipe clip
17 Injection pipe
18 Sleeve nut
19 Injector clamp
20 Injector clamp bolt
21 Injector
22 Eyebolt
23 Injector leak-off pipe
24 Eyebolt
Tightening torque
1: 48 N・m { 4.9 kgf・m / 35 lb・ft }
3: 2.0 N・m { 0.2 kgf・m / 18 lb・in }
6: 8 N・m { 0.8 kgf・m / 6 lb・ft }
8: 18 N・m { 1.8 kgf・m / 13 lb・ft }
9: 28 N・m { 2.9 kgf・m / 21 lb・ft }
11: 24 N・m { 2.4 kgf・m / 18 lb・ft }
12: 104 N・m { 10.6 kgf・m / 77 lb・ft }
15: 24 N・m { 2.4 kgf・m / 18 lb・ft }
16: 8 N・m { 0.8 kgf・m / 71 lb・in }
17: 25 N・m { 2.5 kgf・m / 18 lb・ft }
18: 30 N・m { 3.1 kgf・m / 22 lb・ft }
20: 30 N・m { 3.1 kgf・m / 22 lb・ft }
22: 15 N・m { 1.5 kgf・m / 11 lb・ft }
24: 27 N・m { 2.8 kgf・m / 20 lb・ft }
Injector Installation
1) Install the O-ring to the injector.
2) Install the injector gasket to the injector.
3) Install the injector and injector clamp to the cylinder head.
4) Apply molybdenum disulfide grease to the injector clamp tightening bolt.
5) Temporarily tighten the injector clamp tightening bolt to the cylinder head.
When replacing the injector
1) Erase the old cylinder number ID code on the Injector ID Code label using a black pen, etc.
Note:
Label on the cylinder head cover (SAMPLE)
2) Record the 24-digit Injector ID Code of the new injector.
Note:
Injection Pipe Installation
1) Lightly apply engine oil to the outer circumference of the injector side sleeve nuts on the injection pipe.
2) Temporarily tighten the injection pipe lightly with an open-end wrench until it attaches securely to the common rail (fuel rail) and injector.
Caution:
3) Install the injection pipe clip to the injection pipe.
Tightening torque: 8 N・m { 0.8 kgf・m / 71 lb・in }
4) Final tighten the injector clamp tightening bolt to the cylinder head.
Tightening torque: 30 N・m { 3.1 kgf・m / 22 lb・ft }
5) Securely tighten the injection pipe to the common rail (fuel rail).
Tightening torque: 25 N・m { 2.5 kgf・m / 18 lb・ft }
6) Securely tighten the injection pipe to the injector.
Tightening torque: 30 N・m { 3.1 kgf・m / 22 lb・ft }
Injector Leak-Off Pipe Installation
1) Install the injector leak-off pipe to the injector and cylinder head.
Tightening torque: 27 N・m { 2.8 kgf・m / 20 lb・ft } Cylinder head side
Tightening torque: 15 N・m { 1.5 kgf・m / 11 lb・ft } Injector side
Injector Harness Installation
1) Install the harness bracket and injector harness as a set to the cylinder head.
Tightening torque: 48 N・m { 4.9 kgf・m / 35 lb・ft }
2) Connect the connector to the lower cover.
3) Install the injector terminal nut to the injector.
Caution:
Tightening torque: 2.0 N・m { 0.2 kgf・m / 18 lb・in }
Install cylinder head cover
ECM Setting
Note:
1.Injector ID Code programming
1) Connect the scan tool to the DLC.
2) Turn ON the ignition switch.
3) Select the scan tool item.
4) Program the Injector ID Code into the ECM by following the on-screen instructions.
5) After the programming is completed, turn the ignition switch OFF for 30 seconds
This instruction show you guide on how to solve Allison 3000 & 4000 Gen5 engine…
Here is the illustration show you guide on how to solve Fendt MT1149 tractor SCR…
Here is the instruction show you guide on how to set play between timing pinion…
Perkins 1106D Generation Injector Data Incorrect Test Guide Preparations: Perkins EST 2024A & 2023A…
This instruction show you guide on how to solve Deutz EMR3 engine error 16/108/APSCD trouble…
Here show guide on how to check high pressure relief valve pressure for Kubota L4701…