How to Remove Camshaft for Perkins 2506-15 Industrial Engine

This instruction show you guide on how to remove camshaft for Perkins 2506-15 industrial engine.

 

Preparations:

Perkins EST 2024A & 2023A & 2019A Software Free Download

Perkins SPI2 2018A EPC+Service Manual Free Download

Perkins Communication Adapter 3

 

Procedures:

1.Remove bolts (2) and thrust plate (1).
2.Remove sealing plate (3) from the front housing.
Remove adapter assembly (4) from the camshaft.
3.Remove O-ring seal (5) and O-ring seal (6) from sealing plate (3).

NOTICE
Care must be used when removing or installing the camshaft. Do not damage the finshed surfaces of the camshaft or the camshaft bearings.

4.Use the bolts for the rocker arm shaft assembly to install Tooling (A) at Location (Y).

5.Install Tooling (B) on front housing (7). Tooling (B) is used to support camshaft (8). Do not tighten the bolts for Tooling (B) at this time.

6.Remove Torx screws (9) and cover (10). Remove the O-ring seal from the cover.

7.Move camshaft (8) forward and install one Tooling (C) to the end of the camshaft. Again, move the camshaft forward and install remaining Tooling (C) to the back of first Tooling (C). Align camshaft (8) with the bore of Tooling (B). Tighten the bolts that hold Tooling (B) to front housing (7).
Note: Tooling (C) will support the rear of the camshaft as the camshaft is moved out of the cylinder head and into Tooling (B).
8Use Tooling (D) to move camshaft (8) toward the front of the engine. Reposition Tooling (D), as required.
Note: Avoid lifting the camshaft with Tooling (D). The camshaft should rest on Tooling (A). Lifting of the camshaft can cause misalignment as the camshaft is removed, resulting in damage to the camshaft bearings.
9. Carefully slide the camshaft to the front of the engine for removal. Use two people to remove the camshaft. Keep the camshaft level while the camshaft is being removed from the cylinder
head. The weight of camshaft (8) is approximately 39 kg (86 lb).
Note: Rotate the camshaft during removal. This will prevent the camshaft from binding in the camshaft bearings.
10.Remove Tooling (C) from the camshaft.
11.Remove Tooling (B) from front housing (7).
12.Remove Tooling (A) from the cylinder head.

 

More trouble repair case for Perkins,pls refer to:Perkins Trouble Repair

auto

Recent Posts

Doosan Machine Fault Code P060B ADC Test Error Solution

This instruction show you guide on how to solve Doosan heavy duty machine engine fault…

5 hours ago

Allison 3000 & 4000 Gen5 Fault Code P070C Transmission Fluid Level Sensor Circuit Low

Here is the instruction show you guide on how to solve Allison 3000 & 4000…

1 day ago

Detroit GHG17 Heavy Duty Engine Power Verification With Chassis Dynamometer

Detroit GHG17 Heavy Duty Engine Power Verification With Chassis Dynamometer. The chassis dynamometer is a…

4 days ago

How to Perform Fuel System Test for Kohler Engine EFI System

Here is the instruction show you guide on how to perform fuel system test for…

5 days ago

Fiat and GM ECU 7.9.6 Components Diagram

Vehicles: Vectra 2.0 Flex and Astra Flex More ECU PINOUT Components: ECU Modules Repair Pinpout…

6 days ago

How to Repair Deutz EMR3 SPN 523562 Trouble Code

Error description INJECT. PERIOD ZYL.2 Begin of injection of cylinder 2: the ECU can not…

1 week ago