Categories: Truck Repair

How to Reset ECU Learned Values for Hino Truck by HINO DX3

HINO DX3 allows you to reset HINO truck ECU learned values.This instruction show you guide on how to do that.

 

Related Contents:

Nexiq USB2 Diagnostic Adapter

2024.03 HINO Diagnostic Explorer DX3/DX2 Diagnostic Software Free Download

HINO Trucks EPC Electronic Parts Catalog 2018 2016 Free Download

 

Procedures:

1 Select Learned Values on the System selection screen.
(System selection screen)

2 When you select a system, a list of Learned Values set for the device is displayed.
(Learned Values screen)

3 You can reset the Learned Values by checking the items you would like to reset and pressing the [Reset] button.
(Learning Values screen)
[Reference]
The value to be reset is the preset initial value.

4 A confirmation screen will be displayed. Check the contents and click or press the [OK] button.
(Reset Confirmation screen)
[Reference]
Click or press the [Cancel] button to return to the Learned Values screen.

5 A message is displayed when writing to the device is complete.
(Reset Completion screen)
[Reference]
• This message is displayed regardless of whether the reset was successful or not.
• Items that have been successfully reset are displayed as

Successful in the ECU writing field.
• Items for which reset has failed are displayed as Failed in the ECU writing field.

More HINO DX3 User Guide,please refer to:How to Use HINO DX3

auto

Recent Posts

Doosan Machine Timeout Error of CAN Receive Frame AUXIO1

Here show you guide on how to solve Doosan machine Timeout error of CAN receive…

1 day ago

Liebherr Machine Emergency Stop-Ignition on While Emergency Stop is Active

This instruction show you guide on how to solve Liebherr machine emergency stop ignition on…

1 week ago

How to Solve Doosan Machine U043D CAN Receive Frame Counter Error

This instruction show you guide on how to solve Doosan machine trouble code U043D message…

2 weeks ago

AGCO Machine Trouble Code SPN 1485 – FMI 03 Solution

Here is the instruction show you guide on how to solve AGCO machine trouble code…

3 weeks ago

Detroit DD13 J1939 Wheel-Based Vehicle Speed Sensor Signal Missing

Detroit DD13 EPA10 (2010-13) trouble code SPN 84 FMI 13 (MCM) J1939 Wheel-based vehicle speed…

1 month ago

How to Solve Caterpillar C9 Vehicle Speed Signal Invalid?

This instruction show you guide on how to solve Caterpillar C9 engine trouble code 36…

1 month ago