Truck Repair

How to Use IDSS Adapter to Perform Starting System Check for ISUZU 4JJ3

This illustration show you guide on how to use ISUZU IDSS adapter to start system check for ISUZU 2021 RG01 Euro 4JJ3 AWR6B45 Engine Control 4JJ3 with DPD.

 

 

Related Contents:

ISUZU US-IDSS II 2024 2019 Diagnostic Software Free Download

2023 2019 Isuzu G-IDSS Export Diagnostic Software Free Download

ISUZU IDSS MX2-T Diagnostic Adapter

Nexiq USB Link 2

 

 

1 Engine control system check

Refer to “51.Engine Control 1A.Troubleshooting(4JJ3 with DPD) Diagnostic system check-engine controls”.

 

2 Prioritized DTC check

1) Connect the scan tool.

2) Turn OFF the ignition switch for 1 minute or more.

3) Crank the engine for 15 seconds.

4) Observe the DTC information with a scan tool. Is a DTC set?

Yes

Go to the applicable DTC diagnosis.

 

No

=>Go to Fuel pressure check when cranking.

 

3 Fuel pressure check when cranking

1) Verify that the fuel tank has enough fuel and that the fuel quality is good.

 

Note:

  • If the vehicle runs out of fuel, air may be trapped in the fuel system.

2) While cranking the engine for 5 seconds, observe the Fuel Rail Pressure (FRP) parameter on the scan tool. When cranking, is the Fuel Rail Pressure (FRP) parameter more than or equal to the specified value?

Value: 20 MPa { 2,900 psi }

Yes

=>Go to Sensor inspection.

 

No

=>Go to Fuel system inspection.

 

4 Fuel system inspection

1) Inspect while referring to Fuel system inspection. Is the result normal?

Refer to “51.Engine Control 1A.Troubleshooting(4JJ3 with DPD) fuel system check”.

Yes

=>Go to FRP reduction valve resistance check.

 

No

Repair or replace as necessary.

=>Go to Repair verification.

 

5 FRP reduction valve resistance check

1) Disconnect the FRP reduction valve harness connector (E29).

Refer to “RHD Engine Control (4JJ3 with DPD)” in the ETM (wiring diagram). (Open using the ETM viewer.).

Refer to “LHD Engine Control (4JJ3 with DPD)” in the ETM (wiring diagram). (Open using the ETM viewer.).

2) Measure the resistance of the FRP reduction valve with a DMM. Is the resistance within the specified range?

Value: 0.4 to 0.7 Ω At 20°C {68°F}

 

Yes

=>Go to FRP reduction valve circuit inspection.

 

No

Replace the fuel rail.

Refer to “1.Engine 1C.Fuel System(4JJ3 with DPD) common rail (fuel rail) removal”.

Refer to “1.Engine 1C.Fuel System(4JJ3 with DPD) common rail (fuel rail) installation”.

=>Go to Repair verification.

 

6 FRP reduction valve circuit inspection

1) Inspect for poor connections at the FRP reduction valve harness connector (pins 1 and 2 of E29). Is the connection status normal?

2) Inspect for poor connections at the ECM harness connector (pins 3 and 4 of E2). Is the connection status normal?

3) Inspect the circuit between the ECM (pins 3 and 4 of E2) and the FRP reduction valve (pins 1 and 2 of E29) for high resistance. Is the result normal?

Refer to “RHD Engine Control (4JJ3 with DPD)” in the ETM (wiring diagram). (Open using the ETM viewer.).

Refer to “LHD Engine Control (4JJ3 with DPD)” in the ETM (wiring diagram). (Open using the ETM viewer.).

Yes

=>Go to FRP sensor circuit inspection.

 

No

Repair the circuit or connection as necessary.

=>Go to Repair verification.

 

7 FRP sensor circuit inspection

1) Inspect for poor connections at the FRP sensor harness connector (pins 1, 2, and 3 of E45). Is the connection status normal?

2) Inspect for poor connections at the ECM harness connector (pins 17, 27, and 29 of E2, and pin 30 of E3). Is the connection status normal?

3) Inspect the circuit between the ECM (pins 17, 27, and 29 of E2, and pin 30 of E3) and the FRP sensor (pins 1, 2, and 3 of E45) for high resistance. Is the result normal?

Refer to “RHD Engine Control (4JJ3 with DPD)” in the ETM (wiring diagram). (Open using the ETM viewer.).

Refer to “LHD Engine Control (4JJ3 with DPD)” in the ETM (wiring diagram). (Open using the ETM viewer.).

 

4) Are all of the results normal?

Yes

Replace the fuel rail.

Refer to “1.Engine 1C.Fuel System(4JJ3 with DPD) common rail (fuel rail) removal”.

Refer to “1.Engine 1C.Fuel System(4JJ3 with DPD) common rail (fuel rail) installation”.

=>Go to Repair verification.

 

No

Repair the circuit or connection as necessary.

=>Go to Repair verification.

 

8 Sensor inspection

1) Inspect whether the display of the following sensor input value is normal. Is the result normal?

  • Engine coolant temperature sensor
  • Barometric pressure sensor
  • Boost pressure sensor
  • Intake throttle position sensor

 

Note:

  • Use the scan tool data list or measured value of a vehicle which is considered to be normal.

Yes

=>Go to Engine mechanical inspection.

 

No

Repair or replace as necessary.

 

=>Go to Repair verification.

 

9 Engine mechanical inspection

1) Inspect the other possibilities of the non-starting of the engine for the following.

  • The engine mechanical timing is off.
  • Improper installation of the flywheel and CKP sensor
  • Excessive clogging in the air intake system
  • Excessive clogging in the exhaust system
  • Poor engine compression
  • Water or gasoline contamination in fuel

2) Repair as necessary.

Procedure completion

=>Go to Repair verification.

 

10 Repair verification

1) Reconnect all of the disconnected harness connectors.

2) Turn OFF the ignition switch for 1 minute or more.

3) Start the engine. Does the engine start?

Yes

The system is normal.

 

No

=>Go to Prioritized DTC check.

For more guide about ISUZU,please refer to:ISUZU Trouble Repair.

auto

Recent Posts

HITACHI Construction 4JJ1 P0092 Fuel Pressure Regulator Control Circuit High

Here car-auto-repair.com show you guide on how to solve ISUZU construction 4JJ1 engine P0092 fuel…

14 hours ago

How to Solve Perkins 1106D EPG Engine E398 Low Fuel Rail Pressure Error

Here is the illustration show you guide on how to solve Perkins 1106D electric power…

1 day ago

Deutz EMR3 Aassembly Inspection and Initialisation Test Guide

Here comes the instruction on how to use SerDia2010 to perform assembly inspection and initialization…

3 days ago

HITACHI ZX-5 Excavator No Load Max Differential Pressure Measurement Guide

This instruction show you guide on how to perform No load max differential pressure measurement…

3 days ago

How to Solve Doosan Machine P02EB Over Temperature Error

Here is the instruction show you guide on how to solve Doosan machine P02EB over…

4 days ago

How to Perform Relative Cylinder Compression Test for Detroit GHG17 Engine

This illustration show you how to use Detroit Diesel Diagnostic Link diagnostic software to do…

5 days ago