Categories: Truck Repair

ISUZU 4JJ1 N Series Truck Gearcase Assembly Removal and Installation

This instruction show you guide on how to remove and install gearcase assembly for ISUZU 4JJ1 Euro 4 N series truck.More repair cases please refer to:ISUZU Trouble Repair.

 

Related Contents:

ISUZU US-IDSS II 2024 2019 Diagnostic Software Free Download

ISUZU Worldwide EPC 2018.03 Snap-on EPC Installation Service

 

Procedures:

Removal

1.Remove the engine assembly from the vehicle.

2.Remove the cylinder head.

3.Remove the generator bracket.

4.Remove the vacuum pump.

5.Remove the power steering pump.

Remove the power steering pump at the engine side with the hose attached.

Fasten the power steering pump with hose attached to any suitable position with a wire.

6.Remove the water pump.

7.Remove the fuel supply pump.

8.Remove the crank pulley.

9.Remove the gearcase cover.

10.Remove the idle gear A, idle gear A shaft, idle gear C, and idle gear C shaft.

11.Remove the oil pump.

12.Remove the gearcase(1) and gasket(2).

NOTE: Do not remove the bolt(10) when attaching/detaching the gearcase.

 

Installation

1.Install the gasket.

Apply liquid gasket(TB-1207B or equivalent) to the area indicated in the diagram(1).

The gasket applies it to the both sides

After applying the liquid gasket, install the gearcase within five minutes.

2.Install the gearcase.

Align the positions of the dowel pin and bolt and install the gearcase.

Do not remove the bolt(10) when attaching/detaching the gearcase.

3.Install the oil pump.

4.Install the idle gear A, idle gear A shaft, idle gear C, and idle gear C shaft.

5.Install the gearcase cover.

6.Install the crankshaft pulley.

Install the crankshaft pulley, washer and bolt and tighten them at the specified torque. At this time, apply engine oil to the bolt seat surface and threaded portion.

Tightening torque:185 N.m(18.9kg-m/137 lb-ft)

NOTE: Do not reuse the bolt and washer of the crankshat pulley.

7.Install the fuel supply pump.

8.Install the water pump.

9.Install the power steering pump and tighten it at the specified torque.

Tightening torque:25N-m(2.5kg-m/18 Ib-ft)

10.Install the vacuum pump.

11.Install the generator.

12.Install the cylinder head.

13.Install the engine assembly to the vehicle.

auto

Recent Posts

Detroit DD13 J1939 Wheel-Based Vehicle Speed Sensor Signal Missing

Detroit DD13 EPA10 (2010-13) trouble code SPN 84 FMI 13 (MCM) J1939 Wheel-based vehicle speed…

2 weeks ago

How to Solve Caterpillar C9 Vehicle Speed Signal Invalid?

This instruction show you guide on how to solve Caterpillar C9 engine trouble code 36…

2 weeks ago

Kubota L3301 L3901 Excavator Safety Valve Setting Pressure Test

Kubota L3301 L3901 Excavator Safety Valve Setting Pressure Test Using Injection Nozzle Tester 1 Remove…

3 weeks ago

JCB 200X Series Machine Reduced Power Mode Engine Derate

JCB Engine Fault Derate When a fault is detected, the ECU determines the severity of…

3 weeks ago

Liebherr ECU2 D966 D9512 Engine P1162 Fault Code Solution

Here is a instruction show you guide on how to solve Liebherr ECU 2 D966…

4 weeks ago

AGCO EEM5 DEF Suction Module Tank sensor (CAN)

AGCO EEM5 DEF Suction Module Tank sensor (CAN) The DEF suction module with the CAN-bus…

4 weeks ago