Truck Repair

ISUZU F-Series 6.7 Truck Shift Cable Adjustment/Replacement Guide

This instruction show you guide on how to adjust and replace shift cable for ISUZU F-series truck.

 

Inspection Procedure

1  Turn the ignition to OFF.

2  Block the wheels.

3 Confirm that full forward travel P (park) position can be obtained.

4  Press shifter lock release button.

5 With the transmission shift detent controlling the shift lever position, place shift lever indicator into N (neutral) position.

6 Observe shift lever indicator position. If red indicator band is centered in the N position, no further adjustment is required.

 

Adjustment Procedure

Note: The adjustment for the shift cable is performed at the shift housing end of the cable. The cable is held in place by a clip and washer.

1 Remove the fasteners securing the shift control housing to the shift control, and position the control housing out of the way.

2 Disconnect the shift cable from the shift control by removing the pin and washer then move the cable end off the pivot pin on the shift housing.

 

3 At the transmission rotate the transmission selector shaft lever to the Neutral (N) position.

4 Move the shift lever to the neutral detent position. Note: You may need to manually override BTSI to move the shift lever.

5 While holding the cable end eye adjust the turnbuckle so that the cable end eye fits freely over the pivot pin on the shift control.

6 Install the washer and clip.

7 Tighten both jam nuts on the adjusting turnbuckle.

Note: The backlash is defined as the amount of shift lever travel measured at the PRNDL lens before the transmission selector starts to move.

8 Verify the backlash of the shift lever is less than 2mm when the lever is pushed from the N towards the R direction with the shift button depressed fully.

9 Verify the backlash of the shift lever is less than 4mm when the lever is pushed from the N towards the D direction with the shift button depressed fully.

 

 

Shift Cable Replacement

Removal Procedure

1 Turn the ignition to OFF.

2  Block the wheels.

3  Move the shift lever to the neutral position.

4  Remove the fasteners securing the shift control housing to the shift control, and position the control housing out of the way.

5 Remove the fasteners and clips securing the shift cable to the shift control.

 

6 Remove the cable clip (2), clevis pin (4), and washer (3) securing the shift cable (1) to the transmission shift lever.

7  Note the positions of the clamps securing the shift cable to the vehicle. Remove the bolts and clamps (1) securing the shift cable (2) to the frame rail and brackets.

8  Remove the grommet securing the shift cable to the cab.

9  Remove the shift cable.

 

Installation Procedure

1  Position the new shift cable in the original position.

Notice:

  • Ensure the shift control lever and the transmission shift lever are in the mechanical neutral position. Mechanical neutral at the transmission is 2 clicks away from the bottom most position.
  • Refer to Fastener Notice .

2 Install the bolts and the clamps (1) in order to secure the shift cable (2) to the frame rail and brackets.

3 Install the grommet securing the shift cable to the cab.

Tighten the bolts to 20 N-m (15 lb ft).

4  Install the fasteners and clips in order to secure the shift cable to the shift control.

Tighten the nuts to 22 N-m (16 lb ft).

5  Adjust the shift cable. Refer to Shift Cable Adjustment .

6  Install the fasteners in order to secure the shift control housing to the shift control.

auto

Recent Posts

Doosan Excavator P0408 Maximum EGR Rate Governor Deviation Error Solution

This instruction show you guide on how to solve Doosan excavator P0408 maximum EGR rate…

1 day ago

How to Calibrate 2403 Steering Valve for Fendt 800 S4 Tractor

Here is the instruction show you guide on how to calibrate 2403 steering valve for…

3 days ago

Massey Ferguson Tractor Electrohydraulic Spool Valves Configuration

This function requires all connectors to be disconnected from all electrohydraulic valves on the tractor.You…

6 days ago

How to Remove Center Joint and Center Frame for HITACHI Hitachi EX5600-7B

This instruction show you guide on how to remove center joint and center frame for…

1 week ago

How to Repair Doosan Machine P0100 DTC Signal Error

How to solve Doosan heavy duty machine P0100 fault code signal error of air mass…

2 weeks ago

How to Solve Fendt 800 Vario S4 wayline Running Slow

If the vehicle is oscillating on the wayline or catches up the wayline very slowly…

3 weeks ago