Categories: Excavator Repair

JCB 3CX 4CX Loader Joystick Controllers Removal and Replacement Guide

This instruction show you guide on how to remove and replace joystick controllers for JCB 3CX, 4CX, 214e, 214, 215, 217 & VARIANTS backhoe loader.

 

Related Content:

WinEEM4s JCB Service Tool 2.7.2 2.6.1 Free Download

2024 JCB ServiceMaster 4 v24.3.1 Free Download for Win 10 Win11

2017 JCB Parts Plus+ and Repair Service Manual Free Download

 

Procedures:

Notice:

Hydraulic fluid at system pressure can injure you. Before disconnecting or connecting hydraulic hoses, stop the engine and operate the controls to release pressure trapped in the hoses. Make sure the engine cannot be started while the hoses are open.

Note that the procedure shows the left hand joystick controller. The removal and replacement procedure for the right hand joystick controller is identical.

Removal
1 Park the machine on firm level ground, engage the parking brake and set the transmission to neutral.
Lower the attachments to the ground and stop the engine.Before attempting to remove a joystick controller, vent the pilot circuit accumulator hydraulic pressure as follows:
2 With the operator seat locked in the rear facing position and with the arm rests raised forward (for backhoe operation), switch the starter to ON without starting the engine. Operate the joystick controls several times to vent the hydraulic pressure from the servo system and backhoe rams. Turn the starter switch to the OFF position and remove the key.
3 Remove the screws A (4 off) and lift off the top retaining plate as shown.
4 Using a screwdriver, carefully prise out the plastic cap B. Remove the screws C (2 off) and take off the lower cover to reveal the connections at the valve block.
5 Disconnect the electrical harness connector for the joystick handle switches.
6 Disconnect all hydraulic hoses from the valve block and plug the ports to prevent ingress of dirt. Label each hose before disconnecting to ensure correct replacement. Plug hose ends to prevent ingress of dirt.
7 Carefully prise back the rubber gaiter D to reveal the fixing bolts (4 off) securing the valve to the arm rest.
Remove the fixing bolts and lift the valve assembly from the seat.JCB ServiceMaster 4 2023

Replacement
Replacement is the reverse of the removal sequence.
Note: All hydraulic adaptors that are installed together with a bonded sealing washer must also have JCB Threadseal applied to the threads of the adaptor.

More repair case for JCB,please refer to:JCB Trouble Repair

auto

Recent Posts

HITACHI Construction 4JJ1 P0092 Fuel Pressure Regulator Control Circuit High

Here car-auto-repair.com show you guide on how to solve ISUZU construction 4JJ1 engine P0092 fuel…

1 day ago

How to Solve Perkins 1106D EPG Engine E398 Low Fuel Rail Pressure Error

Here is the illustration show you guide on how to solve Perkins 1106D electric power…

2 days ago

Deutz EMR3 Aassembly Inspection and Initialisation Test Guide

Here comes the instruction on how to use SerDia2010 to perform assembly inspection and initialization…

3 days ago

HITACHI ZX-5 Excavator No Load Max Differential Pressure Measurement Guide

This instruction show you guide on how to perform No load max differential pressure measurement…

4 days ago

How to Solve Doosan Machine P02EB Over Temperature Error

Here is the instruction show you guide on how to solve Doosan machine P02EB over…

5 days ago

How to Perform Relative Cylinder Compression Test for Detroit GHG17 Engine

This illustration show you how to use Detroit Diesel Diagnostic Link diagnostic software to do…

6 days ago