Categories: Truck Repair

Jungheinrich ETM/V 10-12 Tightening Torque for Screwed Connection on Brake Systems

To fulfill their sealing function, the sealing surfaces and threads are designed to meetthe relevant requirements.

 

The application of forces exceeding the maximum values indicated in the tables willdamage and destroy the screwed connection, seals or housing.

 

Related Contents:

Jungheinrich JETI ForkLift Judit-4 v4.37 4.34 2023 Free Download

Jungheinrich JETI ET 4.37 4.34 EPC 2023 Free Download

2022 Jungheinrich Forklift JETI SH v4.36 v4.34 Service Free Download

 

Table 1 -Tightening torque for screwed connections

 

Examples:

With copper sealing ring:admission pressure values, screwed sockets,banjo-bolts with ring sockets, etc.

Without copper sealing ring:screw plugs, union nuts, brake hose fittings,venting valves M 10 and larger.

In the case of cadmium-plated threads 0.7 of the above values must be applied.

This symbol is used before safety instructions that have to be observed in order toprevent any danger to personnel.

This symbol is used before instructions that have to be observed in order to preventany damage to assemblies.

 

Table 2 – Tightening torque for brake components

Prior to installation,apply brake cylinder compound or brake mounting spray to thethreads.

 

For more Jungheinrich trouble repair case,please refer to Jungheinrich Trouble Repair

auto

Recent Posts

QSK60 CM2358 Engine Camshaft Speed/Position Sensor Data Erratic Incorrect

This illustration show you guide on how to repair Cummings QSK60 CM2358 engine camshaft speed/position…

5 days ago

Fendt MT800E Tractor DEF Tank Temperature Does Not Change Solution

Here is the instruction show yo guide on how to solve Fendt MT800E tractor DEF…

7 days ago

HITACHI Construction 4JJ1 P0092 Fuel Pressure Regulator Control Circuit High

Here car-auto-repair.com show you guide on how to solve ISUZU construction 4JJ1 engine P0092 fuel…

1 week ago

How to Solve Perkins 1106D EPG Engine E398 Low Fuel Rail Pressure Error

Here is the illustration show you guide on how to solve Perkins 1106D electric power…

1 week ago

Deutz EMR3 Aassembly Inspection and Initialisation Test Guide

Here comes the instruction on how to use SerDia2010 to perform assembly inspection and initialization…

1 week ago

HITACHI ZX-5 Excavator No Load Max Differential Pressure Measurement Guide

This instruction show you guide on how to perform No load max differential pressure measurement…

2 weeks ago