Truck Repair

Jungheinrich Junior AME13 Directives for Executing Screwed Joints

Related Contents:

Jungheinrich JETI ForkLift Judit-4 v4.37 4.34 2023 Free Download

Jungheinrich JETI ET 4.37 4.34 EPC 2023 Free Download

2023 Jungheinrich Forklift JETI SH v4.36 v4.34 Service Free Download

 

 

Cut pipe at right angle and deburr

All threaded parts must be oiled (do not grease)

Push nut l and cutting ring 2 over the end of pipe 3

1.Screw nut by hand onto the male member.

2.Push pipe in till it comes to rest.

3.Tighten with wrench about 3/4 turn.

4.The cutting ring will cut itself with its edge into he pipe.

5.Unscrew nut fom male member.

1 Checking the cutting edge.

It is of no importance if the cutting ring can be turned on the end of the pipe.

2 The final fitting on the male member is performed with another 3/4 turn.

For more Jungheinrich trouble repair case,please refer to Jungheinrich Trouble Repair

auto

Recent Posts

How to Solve Allison 3000 & 4000 Gen5 Engine Trouble Code P0703

This instruction show you guide on how to solve Allison 3000 & 4000 Gen5 engine…

1 day ago

How to Solve Fendt MT1149 Tractor SCR System Emptying Not Completed

Here is the illustration show you guide on how to solve Fendt MT1149 tractor SCR…

1 week ago

How to Set Play Between Timing Pinion Teeth for CLAAS AXION 920 Tractor?

Here is the instruction show you guide on how to set play between timing pinion…

1 week ago

Perkins 1106D Generation Injector Data Incorrect Test Guide

Perkins 1106D Generation Injector Data Incorrect Test Guide   Preparations: Perkins EST 2024A & 2023A…

1 week ago

How to Solve Deutz EMR3 Engine Error 16/108/APSCD Trouble

This instruction show you guide on how to solve Deutz EMR3 engine error 16/108/APSCD trouble…

1 week ago

Kubota L4701 High Pressure Relief Valve Pressure Checking

Here show guide on how to check high pressure relief valve pressure for Kubota L4701…

2 weeks ago