This illustration show steps on how to remove and reassemble injection pump unit for Kubota U48-4 U55-4 excavator.
Related Contents:
Takeuchi Excavator Workshop EPC+Service Manual 2018 PDF Files
2022 Kubota Takeuchi Diagmaster v22.08.01 v4.1.2 Software Free Download
Kubota EPC Spare Parts Catalogue 2021.06 Download
Procedures:
(Removing the fuel injection pump unit)
1.Detach the window cover (2) for the fuel injection pump unit from the flywheel housing.
2.Place the piston of the 4th cylinder at the top dead center in the compression stroke. Fix the flywheel with the flywheel stopper.
IMPORTANT
NOTE
3.Unscrew the two plugs (3) of the injection pump unit.
4.Tighten the upper fuel camshaft lock screw (8) until it comes into contact with the fuel camshaft. Make sure the camshaft does not move any longer.
5.Tighten the lower fuel camshaft lock screw (8) until it comes into contact with the fuel camshaft.
NOTE
6.Disconnect the lubricating oil pipe (4).
7.Using a white marking pen or the like, put an injection timing mark (7) on the injection pump unit and on the crankcase 1.
8.Loosen the three injection pump unit mounting nuts (1).
9.Remove the injection pump unit support (5) and take out the injection pump unit.
(Reassembling the fuel injection pump unit)
1.Place the piston of the 4th cylinder at the top dead center in the compression stroke. Fix the flywheel with the flywheel stopper.
2.Install the injection pump unit to the crankcase 1.
3.Make sure of aligning the alignment marks of the injection pump gear (9) and the idle gear (10).
4.Take off the fuel camshaft lock screws (8) and tighten the plugs (3) for plugging.
5.Moving the injection pump unit clockwise (viewed from front cover side), align the injection timing marks (7) on the injection pump unit and on the crankcase 1.
6.Tighten the injection pump unit mounting nut (1) to the specified torque.
7.Reconnect the lubricating oil pipe (4) and place the injection pump unit support (5) and the window cover of the injection pump unit.
8.Remove the flywheel stopper.
9.Check the injection timing. (See the “Injection Timing”.)
10.If the injection timing is not within the specification, repeat “4.” to “9.” again.
More repair case for Kubota,please refer to:Kubota Trouble Repair
Here comes the instruction on how to use SerDia2010 to perform assembly inspection and initialization…
This instruction show you guide on how to perform No load max differential pressure measurement…
Here is the instruction show you guide on how to solve Doosan machine P02EB over…
This illustration show you how to use Detroit Diesel Diagnostic Link diagnostic software to do…
This instruction show you guide on how to solve PACCAR brake saver oil temperature gauge…
This instruction show you guide on how to solve Deutz EMR3 engine trouble code 19…