New Holland LW 130.B Wheel Loader Rotary Feed Pump Disassembly and Assembly

This post prescribes fuel pipelines(from pumping elements to injectors, bleeding recovery pipes from injectors to pump, LDA pipeline and feed provided by priming pump) shall all be disassembled.

Electrical connection to feed pump shall be disconnected.

Accelerator cable shall be disconnected.

 

Related Contents:

CNH DPA5 Adatper

2024 CNH EST 9.10 9.2New Holland Diagnostic Software Free Download

New Holland Agricultural & Construction Parts+Service Manual Free Download

 

 

Notice:

In case feed pump replacement is necessary, this shall be supplied pre-set already as spare part.

On the other hand, in case the pump shall be disassembled and reassembled later on without being repaired it will be necessary to pr-set it while it is still assembled to the engine and disassemble it only afterwards.

 

The following procedure analyses this second hypothesis since it is the more complex.

Rotate with caution the flywheel following its own rotation sense to annul the gear slacks and at the same time keep the(→) pin pressed until when this last one is fitting into the port of the camshaft gear.

This way the P15. shall be determined within N.l. cylinder.

Disassemble the starter from the flywheel box(l) and use the 380000988 tool(2) rotate the flywheel.

Flywheel rotation shall be carried out with extreme caution.The pin charged by excessive shearing stress may get damaged.

Partially loosen the lateral screw (2) locking the pump shaft and remove the slip washer(2). Absolutely keep the slip washer(it is recommended to fox it with stripe or wire to the pump).

Tighten the lateral screw(1) blocking rotation of the pump shaft.

From timing side, remove the cover(2) loosening the screws(I) in order to have access to the union fixing nut (3) to the pump driving gear.

Loosen thefixing nut(3) and remove the relating washer.

From the pump side, loosen the fixing nuts(1) without removing them in order to enable moving the pump backwards using 380000979 extractor.

Assemble the 380000979 extractor throughout the two threaded ports (4. Figure 97) and withdraw the gear from the pump shaft.

Properly hold the feed pump and loosen completely the fxing nuts.

Withdraw the pump from the studs, together with the gasket.

When assembling the feed pump to the engine, it is necessary to meet the PM.S, requirements for the Nl. cylinder.

Use the 380000988 tool(2)n the flywheel box(I) to carry out flywheel rotation and operate using the pin as previously described.

Hold the pump driving gear to avoid interference or crawling during timing gear rotation.

Assemble the pump pre-set in its housing on the engine, fitting the shaft into the gear port(not provided with wrench).

Tighten the fxing nuts(1) locking the pump flange in the slot centre.

The gasket removed during pump disassembly shall not be utilised again.

Always use original spare parts.

On the timing side, throughout the specially appointed port, fit the washer and screw up the fixing nut(3) to the pump shaft. Lock the nut to the 90-95 Nm couple.

Partially loosen the screw (2) locking the pump shaft rotation and fit the slip washer(1). Tighten the screwfixing above said washer: this way the feed pump shaft is free to rotate.

Assemble the cover(2. Figure 101) including gasket and tighten the screws(I, Figure 10l).

Pull the pin outwards setting the camshaft gear free.

Disassemble the 380000988 tool locking flywheel rotation; place the starter in its housing Connect all pipelines (from pumping elements to injectors, bleeding recovery pipes from injectors to pump, LDA pipeline and feed provided by priming pump).

Connect electrical connections to electro-magnets on the hydraulic head and on KKSB.

In case pump removal has been carried out while the engine was assembled, connect acceleration cable.

auto

Recent Posts

QSK60 CM2358 Engine Camshaft Speed/Position Sensor Data Erratic Incorrect

This illustration show you guide on how to repair Cummings QSK60 CM2358 engine camshaft speed/position…

5 days ago

Fendt MT800E Tractor DEF Tank Temperature Does Not Change Solution

Here is the instruction show yo guide on how to solve Fendt MT800E tractor DEF…

7 days ago

HITACHI Construction 4JJ1 P0092 Fuel Pressure Regulator Control Circuit High

Here car-auto-repair.com show you guide on how to solve ISUZU construction 4JJ1 engine P0092 fuel…

1 week ago

How to Solve Perkins 1106D EPG Engine E398 Low Fuel Rail Pressure Error

Here is the illustration show you guide on how to solve Perkins 1106D electric power…

1 week ago

Deutz EMR3 Aassembly Inspection and Initialisation Test Guide

Here comes the instruction on how to use SerDia2010 to perform assembly inspection and initialization…

1 week ago

HITACHI ZX-5 Excavator No Load Max Differential Pressure Measurement Guide

This instruction show you guide on how to perform No load max differential pressure measurement…

2 weeks ago