Categories: Auto Repair

Suzuki Grand Vitara JB416 JB420 AC System Initial Charging

The initial charging of the A/C system is performed from the high-pressure side with the engine stopped.And next, this method must be followed by charging from the low-pressure side with the engine running.More repair case for Suzuki,please refer to:Suzuki Trouble Repair

 

Related Contents:

2019 2014 Suzuki Worldwide Automotive EPC Free Download

 

Procedures:
1)Check to make sure that hoses are routed properly after evacuating the system.
2)Connect low charging hose (1) and high charging hose (2) of the manifold gauge set (3) in position.
Thus open refrigerant container valve (4) to purge the charging line.
3)Open the high-pressure side valve (6) and charge refrigerant to system.
4)After a while, open the low-pressure side valve (5) and close the high-pressure side valve (6).

Make sure that high pressure-side valve is closed securely.

5) Start engine and keep engine speed at 1,500 rpm.
Then, operate A/C system.
6) Charge A/C system with refrigerant in vapor state. At this time, refrigerant container should be held upright.
7) When refrigerant container (3) is emptied, the use following procedure to replace it with a new refrigerant container (3).
a) Close low pressure valve.
b) Replace empty container (3) with a refrigerant container which has been charged with refrigerant. When using refrigerant container tap valve (4), use the following procedure for
replacement.
i) Retract needle (1) and remove refrigerant container tap valve (4) by loosening its plate nut (2).
ii) Install previously-removed refrigerant container tap valve (4) to a new refrigerant container (3).

c) Purge any air existing in center charging hose.
When using refrigerant container tap valve, use the following procedure to purge air.
i) Once fully tighten refrigerant container tap valve and then loosen (open) plate nut slightly.
ii) Open low pressure valve of manifold gauge set a little.
iii) As soon as refrigerant comes out with a “hiss” (1) through a clearance between refrigerant container and tap valve, tighten plate nut as well as manifold gauge set low pressure valve.
iv) Turn handle of tap valve clockwise so that its needle is screwed into the new container to make a hole for refrigerant flow.

8) After the system has been charged with specified amount (570 ± 30 g) of refrigerant or when low pressure gauge and high pressure gauge have indicated the following specified value, close low pressure side valve on manifold gauge set.

auto

Recent Posts

How to Solve Liebherr Machine Power or Speed Reduction?

How to solve Liebherr machine trouble code P1188 power or speed reduction emission related failure.…

1 week ago

Doosan Machine Timeout Error of CAN Receive Frame AUXIO1

Here show you guide on how to solve Doosan machine Timeout error of CAN receive…

2 weeks ago

Liebherr Machine Emergency Stop-Ignition on While Emergency Stop is Active

This instruction show you guide on how to solve Liebherr machine emergency stop ignition on…

4 weeks ago

How to Solve Doosan Machine U043D CAN Receive Frame Counter Error

This instruction show you guide on how to solve Doosan machine trouble code U043D message…

1 month ago

AGCO Machine Trouble Code SPN 1485 – FMI 03 Solution

Here is the instruction show you guide on how to solve AGCO machine trouble code…

1 month ago

Detroit DD13 J1939 Wheel-Based Vehicle Speed Sensor Signal Missing

Detroit DD13 EPA10 (2010-13) trouble code SPN 84 FMI 13 (MCM) J1939 Wheel-based vehicle speed…

2 months ago