The initial charging of the A/C system is performed from the high-pressure side with the engine stopped.And next, this method must be followed by charging from the low-pressure side with the engine running.More repair case for Suzuki,please refer to:Suzuki Trouble Repair

 

Related Contents:

2019 2014 Suzuki Worldwide Automotive EPC Free Download

 

Procedures:
1)Check to make sure that hoses are routed properly after evacuating the system.
2)Connect low charging hose (1) and high charging hose (2) of the manifold gauge set (3) in position.
Thus open refrigerant container valve (4) to purge the charging line.
3)Open the high-pressure side valve (6) and charge refrigerant to system.
4)After a while, open the low-pressure side valve (5) and close the high-pressure side valve (6).

Make sure that high pressure-side valve is closed securely.

5) Start engine and keep engine speed at 1,500 rpm.
Then, operate A/C system.
6) Charge A/C system with refrigerant in vapor state. At this time, refrigerant container should be held upright.
7) When refrigerant container (3) is emptied, the use following procedure to replace it with a new refrigerant container (3).
a) Close low pressure valve.
b) Replace empty container (3) with a refrigerant container which has been charged with refrigerant. When using refrigerant container tap valve (4), use the following procedure for
replacement.
i) Retract needle (1) and remove refrigerant container tap valve (4) by loosening its plate nut (2).
ii) Install previously-removed refrigerant container tap valve (4) to a new refrigerant container (3).

c) Purge any air existing in center charging hose.
When using refrigerant container tap valve, use the following procedure to purge air.
i) Once fully tighten refrigerant container tap valve and then loosen (open) plate nut slightly.
ii) Open low pressure valve of manifold gauge set a little.
iii) As soon as refrigerant comes out with a “hiss” (1) through a clearance between refrigerant container and tap valve, tighten plate nut as well as manifold gauge set low pressure valve.
iv) Turn handle of tap valve clockwise so that its needle is screwed into the new container to make a hole for refrigerant flow.

8) After the system has been charged with specified amount (570 ± 30 g) of refrigerant or when low pressure gauge and high pressure gauge have indicated the following specified value, close low pressure side valve on manifold gauge set.

auto

Recent Posts

Deutz EMR3 Trouble Code 78/ 190 Speed Sensor Signals Out of Phase

This instruction show you guide on how to solve Deutz EMR3 trouble code 78/ 190 EngMOfsCaSCrS Speed…

4 days ago

How to Release Park Brake Manually for CASE IH 20 Series Combine

This instruction show you guide on how to release park brake manually for CASE IH…

6 days ago

How to Replace High Pressure Limit Valve for Fendt 900 Vario COM III?

Here is the instruction show you guide on how to replace high pressure limit valve…

1 week ago

How to Select JCB Machine AJ45E Machine Software

There are three software options for Machine Software on AJ45E&EH machines.   Related Contents: 2025 JCB…

2 weeks ago

How to Solve Doosan Excavator U010F CAN-Receive-Frame DPM1 Timeout Error

Here is the instruction show you how to solve Doosan Stage V engine excavator U010F…

2 weeks ago

Ford EEC V ANIL and ENIO Electrical Controller Modules Pinout

Ford EEC V ANIL and ENIO Electrical Controller Modules Pinout   INDIGO Vehicles: With 1.0…

3 weeks ago